The residential project Archi Guramishvili is being built in the best location in Sanzona, on Guramishvili Avenue, near the metro station "Ghrmaghele". The multifunctional 32-storey building also includes commercial space. 1 500 sq.m. green yard will ideally balance the exterior of the modern architecture. The energy-efficient and environmentally friendly building block of the German brand YTONG is used in the construction, which saves energy by 40%, which reduces utility bills.
Home
Parking
Ongoing
42%
Children's playground
Commercial space
Parking
Generator
Water Reservoir
Children's playground
Commercial space
Parking
Generator
Water Reservoir
Ytong Block
Heidelberg Concrete
Low emission glass
HPL Panels
HPL Panels
HPL Panels
Caparol Paint
Caparol Paint
Archi Guramishvili
Guramishvili Avenue, Tbilisi
Ongoing
Installation of columns on the 15th floor in the first part of the building has been completed;
Installation of the floor slab on the 16th floor in the second part of the building has been completed;
Perimeter block laying work from the 12th to the 13th floor in the first part of the building has been completed;
Internal block laying work on the 9th and 10th floors in the second part of the building has been completed;
Perimeter block laying work on the 11th floor in the second part of the building has been completed;
Plastering work of the apartments on the 4th floor in the first part of the building has been completed;
Installation of metal-plastic doors and windows from the first to the fifth floor in the first part of the building has been completed;
Installation of metal-plastic doors and windows from the second to the eighth floor in the second part of the building has been completed;
Internal block laying work from the 9th to the 11th floor in the first part of the building is being completed;
Installation of metal railings from the 2nd to the 5th floor in the first part of the building is being completed;
Installation of metal railings from the 3rd to the 8th floor in the second part of the building is being completed;
Perimeter block laying work on the 12th floor in the second part of the building is in progress;
Perimeter waterproofing work is in progress;
Column installation work on the 16th floor in the second part of the building is in progress;
Internal block laying work from the 12th to the 13th floor in the first part of the building has started;
Plastering work of the apartments on the 8th floor in the second part of the building has started;
Plastering work of the apartments on the first floor in the first part of the building has started;
Facade plastering work from the 2nd to the 6th floor in the second part of the building has started;
Choose area type
Choose floor
Choose area
Number of rooms
Apartment price
Archi Guramishvili | Apartment 14
Rooms
4
Floor
1
sq.m.
90
Archi Guramishvili | Apartment 12
Rooms
3
Floor
1
sq.m.
88.7
Archi Guramishvili | Apartment 10
Rooms
3
Floor
1
sq.m.
78.2
Archi Guramishvili | Apartment 6
Rooms
2
Floor
1
sq.m.
67.5
Archi Guramishvili | Apartment 5
Rooms
4
Floor
1
sq.m.
120.4
Archi Guramishvili | Apartment 4
Rooms
3
Floor
1
sq.m.
76.1
Archi Guramishvili | Apartment 3
Rooms
3
Floor
1
sq.m.
77.5
Archi Guramishvili | Apartment 2
Rooms
3
Floor
1
sq.m.
78.1